Scott's Zodiac XL building documentation site

ScottWaters.com

 

HOMERudderHorizontal StabilizerElevatorFlapsAileronsRight WingLeft WingFuselageCabin

The flaps were completed in February 2004. After completing the rudder and elevator, the flaps were a piece of cake.

Flap1small.JPG

After the skin is pre-drilled, ribs are lined up inside and drilled.

flap2small.JPG

All holes drilled and clecoed for A5 Rivets.

flap3small.JPG

Detail of rivets and hinge.

flap4small.JPG

Flaps complete!