|

First step is
connecting longerons and cross stiffeners to the bottom skin.
|

Side skins were
polished, drilled with L angles and drilled to bottom longerons.
|
|

The
rear structure is complete and ready to rivet. The top longerons will not be riveted until the top skins are ready to rivet.
|

The firewall is
complete and riveted with nose gear channel.
|
|

Cabin floor with
rudder pedals and brakes installed. Ready to rivet.
|

Longerons were
installed to top engine mounts and clamped in place to rear longerons. Side skins were cut to shape, channel cut for
gear and slots cut for wing spars. Drilled to top longeron and firewall. Next to do is everything else!!
|